September 21, 2016

Inspecting Construction Erosion Part 2

 

Inspecting Construction Erosion Part 2  Inspecting construction erosion controls at a road construction project. Best management practices include: silt fence, stabilized construction entrance, drip pan, secondary containment of gasoline and concrete washout pan.

Issues discussed include: sediment track out, possible catch basin collecting dirty water, gas can sitting out of secondary containment, potential for high pH concrete wash water overflow and equipment drip pan in poor condition.