Sheetflow Construction Erosion and Sediment Control

March 26, 2019

Clouds # 1

Filed under: Photo — Tags: , , — Sheetflow @ 5:33 am

DSCN8785 adjusted bw

David Jenkins-One Click Off Photography

March 19, 2019

Unrolled Asphalt Berm Edge Clean Water Diversion

Here is another cool trick for keeping clean water out of your project. The contractor put down ATB (asphalt-treated base) and asphalt but didn’t roll (compact) the edge, which left a 3 or 4 inch berm. Clean rain water was kept on the asphalt rather than flowing off into the dirt shoulder and disturbed areas.

March 12, 2019

Storm Clouds Over Kanab, Utah

Filed under: Photo — Tags: , , , , — Sheetflow @ 1:32 am

Storm Clouds Over Kanab, Utah

David Jenkins-One Click Off Photography

March 8, 2019

Curb Inlet Protection

According to the Minnesota Stormwater Manual:

“Inlet protection devices intercept and/or filter sediment before it can be transported from a site into the storm drain system and discharged into a lake, river, stream, wetland, or other waterbody.

These devices also keep sediment from filling or clogging storm drain pipes, ditches, and downgradient sediment traps or ponds.

Inlet protection may also include placement of a barrier to create a bypass of an inlet transferring flow downstream to a sediment trap, basin, or other inlet discharging to a non-critical area.”

Nothing wrong with sediment control BMPs, as they are necessary tools in an effective erosion and sediment control system.  However, these do not “filter” sediment. 

When properly installed, these allow for ponding of water which allows larger sediment to settle out, keeping it out of the storm system.  This is a good thing, but doesn’t necessarily prevent water quality non-compliance.   

I do like this statement in the manual : “Caution: To the extent feasible, erosion prevention practices such as stabilization are preferred to sediment control practices.”

In my world, where we have to meet a turbidity effluent limit of 25 NTUs, stabilization and stormwater management are the primary methods used to meet strict turbidity limits.  

March 1, 2019

Managing Construction Projects to Prevent Sediment Trackout

I originally submitted this abstract for the 2019 IECA Denver conference . It was not accepted as a presentation but as an article in the October 2018 edition “Environmental Connection Magazine”.

Abstract
Sediment tracking from construction sites onto public roads and highways is a continual source or frustration for both regulators and contractors. The standard best management practices (BMPs) available, such as stabilized construction entrances and sweepers, often don’t work at all and, at best, only reduce total sediment by 30-50% which is inadequate for preventing water quality violations. In addition to water quality problems, sediment tracking onto roadways can generate dust, which may violate clean air standards and cause unsafe conditions, especially on highways.
This paper will discuss BMPs, methods, and procedures, which can be used by contractors to prevent sediment from being tracked onto roadways in the first place. In addition, ways to significantly reduce sediment loss will be presented. Some of these methods include:

• Passive tire baths
• Various tire washes
• Keeping vehicles of dirt
• Vacuum vs. mechanical sweepers
• Road washing
• Contract specifications

Each method will be discussed with pros and cons, design information and contract specifications.

The full magazine can be found at:
Environmental Connection, October/November 2018, Volume 13, Issue 4.

The article is attached below.