Sheet Flow Construction Erosion Control

October 29, 2019

Open Catch Basin Open Again

Photo: David Jenkins

The saga continues… the next inspection looked like the first inspection. The open catch basin is open again. 500 + NTU water draining into the catch basin. What happened?

Photo: David Jenkins

As suspected, someone didn’t like the flooding, so they punctured the 30 mil PVC. I am wondering why the contractor erosion control lead is not finding this.

Powered by WordPress