Sheetflow Construction Erosion and Sediment Control

June 25, 2019

Hydroseeding on the Edge

June 4, 2019

Construction Erosion Control – Rough vs Smooth Slope

Dramatic example of the effect of rainfall on a smooth versus rough slope. The rough side was “track walked” using a small Caterpiller tractor, the other side was “back-bladed” smooth with the same tractor. Both test plots were prepared with the same soil and then sprayed with bonded fiber matrix (BFM) with seed and fertilizer.

January 14, 2019

Bonded Fiber Matrix BFM Needs to Cure Before it Rains

Bonded fiber matrix (BFM) needs to dry for 24 to 36 hours before it rains or else it can start to wash off.

April 1, 2017

Bonded Fiber Matrix BFM Uniform Coverage

Filed under: Video — Tags: , , , , , , , , , — Sheetflow @ 7:00 am

How to inspect bonded fiber matrix (BFM) application.

Powered by WordPress