Sheetflow Construction Erosion and Sediment Control

July 23, 2019

Lobster Protection in Portland, Maine

In Washington, it’s salmon protection.

March 19, 2019

Unrolled Asphalt Berm Edge Clean Water Diversion

Here is another cool trick for keeping clean water out of your project. The contractor put down ATB (asphalt-treated base) and asphalt but didn’t roll (compact) the edge, which left a 3 or 4 inch berm. Clean rain water was kept on the asphalt rather than flowing off into the dirt shoulder and disturbed areas.

Powered by WordPress