Sheetflow Construction Erosion and Sediment Control

October 6, 2019

Construction Entrance Fail

This is a 30 + acre site with one access point, this one. If this was my project, I would have specified a tire wash with an asphalt exit to the street. The tire wash would have been long enough for two tire rotations, have high pressure, low volume nozzles located such that all tire surfaces were sprayed. This system would also have an on-board, treatment polymer injection system to keep the tire wash water relatively clean. I would have specified that the water be tested for turbidity daily, measured at 50 NTUs or less. Since the water is classified as “process water”, I would have required it to be tested for metals and other contaminants, then hauled to an appropriate disposal facility.
Photo: David Jenkins

September 24, 2019

That’s Some Fancy Rock Construction Entrance

I saw this on the way to work and thought it was amusing on the surface. Really, though, I think they needed the elevation to access the upper part of the site.