Sheetflow Construction Erosion and Sediment Control

April 2, 2019

Migratory Bird Treaty Act Nest Removal

A little something different this week: we are going to do some demolition next to the waterfront this spring. Starting in April or May, seagulls begin nesting on buildings around the waterfront. When seagulls nest, you can’t demolish the buildings until you apply for and get permission for a “Take” of a bird covered under the Migratory Bird Treaty Act. This takes time, holds up the contractor, everyone gets frustrated. In order to head this off, I wrote some contract specifications, which hopefully, will keep this from happening

NESTING BIRD WATCH AND CONTROL

  1. Owner shall provide bird watch services up until 30 days after Contract Execution, to ensure there are no nesting birds that may impact the Contractor’s ability to perform work. At 30 days after Contract Execution, the Contractor shall take over full responsibility for this work.
  2. Contractor shall be responsible for preventing migratory birds from nesting on the roofs of buildings to be demolished. 
  3. Prevention shall include, at a minimum, once daily roof inspections to determine whether migratory birds are conducting nest building activity. 
  4. Nests that do not contain eggs and that are not in the possession of migratory birds shall be destroyed.
  5. Nests that contain one or more eggs shall not be disturbed and shall be immediately reported to the Engineer.
  6. Nests that are complete and in the possession of a migratory bird, with or without eggs, shall not be disturbed and shall be immediately reported to the Engineer.
  7. All Project delays and associated costs due to nesting birds discovered after the Contractor assumes responsibility for bird watch/control shall be the full responsibility of the Contractor.

February 16, 2019

Vacuum Sweeper Maintenance

If I specify a vacuum sweeper on a construction project, I expect it to be operational.

I require all systems to be functional per manufacturers specifications.

If not, the sweeper goes away, maybe the job is shut down, until a working sweeper is brought to the site.

Specifications:
1) Power brooms shall not be utilized without prior approval by
the Engineer.

2) Contractor shall have sufficient working vacuum sweepers on
site at all times work is being performed.

3) All sweepers shall have on-board water spray systems that
shall be operating at all times.

4) systems shall function per manufacturer specifications
including, but not limited to, spray water systems, blowers,
vacuum nozzles, hoses, debris hopper, hydraulics and
electrical.

5) At no time shall debris hopper seals leak debris and liquids.