Sheetflow Construction Erosion and Sediment Control

March 19, 2019

Unrolled Asphalt Berm Edge Clean Water Diversion

Here is another cool trick for keeping clean water out of your project. The contractor put down ATB (asphalt-treated base) and asphalt but didn’t roll (compact) the edge, which left a 3 or 4 inch berm. Clean rain water was kept on the asphalt rather than flowing off into the dirt shoulder and disturbed areas.

No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URL

Sorry, the comment form is closed at this time.

Powered by WordPress