This was about a 3:1 slope that had been track walked but not hydroseeded. Rill formation began with the first rain event and progressed with subsequent rain storms over a period of two months.
This was about a 3:1 slope that had been track walked but not hydroseeded. Rill formation began with the first rain event and progressed with subsequent rain storms over a period of two months.
Powered by WordPress