Sheetflow Erosion Control Erosion Control for the CESCL

June 1, 2020

Lake Emelia in Port Orchard

Video: Kitsap Sun

This was a 2 inch in 24 hour storm, or about a 2 year storm event, which should have been pretty easily contained if the pond had been designed as a temporary sediment pond for use during construction. Also, they should have had a construction stormwater treatment system set up to treat for turbidity. There really is no excuse for this. Poor planning.

Powered by WordPress