Sheet Flow Construction Erosion Control

April 27, 2020

Cold Mix Asphalt Berm

Photo: David Jenkins

Cold mix asphalt berm works too. Used along the base of “jersey” barriers, high pH water from a concrete breaking operation is contained for later disposal off site.

July 1, 2020

Debris Stockpile

Photo: David Jenkins

To contain this debris stockpile, jersey barriers and cold mix asphalt have been used.

December 2, 2020

Asphalt Berm

Presentation: David Jenkins

This is a cold patch asphalt berm used to contain high pH water from a concrete crushing operation.

Presentation: David Jenkins

Hot mix asphalt used to contain project water and direct it to a sump and pump. The water was pumped to a header pipe that was connected to a chitosan-enhanced treatment system.

September 27, 2020

Erosion Control Photos

Filed under: — Sheetflow @ 3:49 pm

All photos may be used for teaching and training purposes with attribution to: David Jenkins, sheetflow.com

Photos may not be used for commercial purposes without prior express permission from David Jenkins, sheetflow.com

Powered by WordPress