Sheet Flow Construction Erosion Control

December 2, 2020

Asphalt Berm

Presentation: David Jenkins

This is a cold patch asphalt berm used to contain high pH water from a concrete crushing operation.

Presentation: David Jenkins

Hot mix asphalt used to contain project water and direct it to a sump and pump. The water was pumped to a header pipe that was connected to a chitosan-enhanced treatment system.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress