Sheet Flow Construction Erosion Control

August 24, 2020

Construction Access with Steel Plates

We built a construction access with steel plates across this stormwater swale. Then we laid compost socks and straw wattles along side of the eco blocks placed along the edges.

The adjacent parking lot drains into the swale and must be protected from dirty construction stormwater discharges.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress