Sheetflow Erosion Control Erosion Control for the CESCL

December 21, 2020

Root Wads and Cross Logs

Filed under: Uncategorized — Sheetflow @ 6:29 am

We finished installing the root wads and cross logs, the toe and edge logs. All that’s left is the landscaping and planting this winter. When I took this photo last Thursday, the tide was just over +12.

By excavating 1200 feet of Duwamish Waterway shoreline, creating intertidal habitat between +8 and +12 elevations, and installing native plants, we are adding valuable salmon habitat.

Photo: David Jenkins-Sheetflow Erosion Control

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URL

Leave a comment

You must be logged in to post a comment.

Powered by WordPress