Sheet Flow Construction Erosion Control

October 20, 2020

Steel Plates Trackout

Video: David Jenkins-Sheetflow Erosion Control

Trackout happens when you back trucks off of the steel plates onto dirt to unload materials. The plan was for trucks to stay on plates, back to the end and dump. The excavator was to move the materials around the site. There is no tire wash on this project as there isn’t room, so staying on the plates is required and necessary. The trackout is onto the neighbors parking lot, our only site access, and they don’t appreciate dirt ending up in their stormwater swale when the rains come.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress