Sheet Flow Construction Erosion Control

January 27, 2012

Inspect a Temporary Drainage System

Temporary construction erosion and sediment control means managing storm water until the permanent storm system is operational and the site has been stabilized with vegetation, concrete, asphalt, landscaping and other practices.  This shows how to inspect a temporary drainage system.

 

Video: David Jenkins

Powered by WordPress