July 21, 2020

High pH from Concrete Crushing Operation in Runoff

Photo: David Jenkins

I believe pH of 12.5 makes the water a dangerous waste requiring special handling.

April 17, 2020

Construction Inspection-Container Crane Rail Removal

Photo: David Jenkins

We are upgrading the dock to handle larger container ships so, the old cranes, and rails that they travel on must be removed. This is at the end of the “water-side” crane rail. This trench, or slot, is several hundred feet long. When it rains, it will fill with rainwater and overflow into the bay.

The trench is filled with dirt and concrete debris left over from the demolition and removal of the old rail, so the water will be turbid and have elevated pH. I told the contractor to block the end of the trench before it rains again, using cold patch asphalt or some other method of their choosing.

Because construction erosion and sediment control is about managing rainwater, I always look for ways water can discharge from a project. This is not something that would have been caught in the planning stage of the project.

November 19, 2013

How to Read a Soil Test Report

SoilTestInterpretation

With thanks to:
Litchfield Analytical Services
535 Marshall Street
Litchfield, MI 49252

www.litchlab.com

Powered by WordPress