Preventable Trackout

Photo: David Jenkins

This trackout was preventable. Asphalt was removed by the contractor to work on the new building foundation; the driveway asphalt was left in place, which is good. Gravel base course was delivered to be placed under the concrete slab.

Instead of backing all of the way into the site, over wet dirt, the trucks could have stayed on the asphalt driveway to unload. Site equipment could have been used to move the gravel.

The contractor could also have dumped gravel next to the asphalt, then graded it back into the site to provide a construction access into the site. In this way, the delivery truck could have stayed on gravel rather than driving on dirt.

While this is not a lot of dirt on the road, it does add up and is a magnet for inspectors and regulators to visit the site.