Trackout happens when you back trucks off of the steel plates onto dirt to unload materials. The plan was for trucks to stay on plates, back to the end and dump. The excavator was to move the materials around the site. There is no tire wash on this project as there isn’t room, so staying on the plates is required and necessary. The trackout is onto the neighbors parking lot, our only site access, and they don’t appreciate dirt ending up in their stormwater swale when the rains come.

October 15, 2020

Sediment Trackout Happens

Sediment trackout happens when you back trucks off of the steel plates onto dirt to unload materials. The plan was for trucks to stay on plates, back to the end and dump.

The excavator was to move the materials around the site. There is no tire wash on this project as there isn’t room, so staying on the plates is required and necessary. The trackout is onto the neighbors parking lot, our only site access, and they don’t appreciate dirt ending up in their stormwater swale when the rains come.

Video: David Jenkins-Sheetflow Erosion Control

September 21, 2020

Steel Plate Construction Access

Video: David Jenkins

This is a steel plate construction access that we built across a live stormwater swale. We have installed compost socks along the edge to keep construction runoff out of the swale.

August 24, 2020

Construction Access with Steel Plates

We built a construction access with steel plates across this stormwater swale. Then we laid compost socks and straw wattles along side of the eco blocks placed along the edges.

The adjacent parking lot drains into the swale and must be protected from dirty construction stormwater discharges.