

The contractor had to connect a new storm system from up the hill into an existing catch basin in the foreground. After they completed the connection but before paving, they covered the pipe run with plastic and sand bags to protect from dirty water entering the catch basin. Work was completed during dry summer weather. Paving took place a couple of months later.