Eroded Stockpile

Photo: David Jenkins

This eroded stockpile is well within the project boundaries and there is nothing leaving the project. I consider this a problem for the contractor, not for water quality compliance. By allowing this to occur, the contractor has made the eroded stockpile soil unsuitable for use in embankment fill and has to haul it offsite at their expense. This could have been avoided by berming the top of the stockpile to direct water to pipe slope drain pipe that prevents water from flowing over the side of the fill.