Sheet Flow Construction Erosion Control

October 4, 2019

Broken Waterline

Photo: David Jenkins

This is caused by a broken 16 inch waterline. Fortunately, all of the muddy water was contained in a 72″ storm pipe with a valve. Water was then pumped to a Chitosan-enhanced Sand Filtration (CESF) system for treatment to 5 NTUs for discharge to a creek. Knowing this project was going to be constructed over several winter seasons, we specified the CESF system in the contract.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress