This is the first project we have cut asphalt to allow construction stormwater to infiltrate. The area is paved, flat. The sweeper runs constantly but the water is still too turbid to go down the drain. The fill soil under the asphalt is sandy. If we just covered the catch basin with 30 Mil PVC, the area would just flood, then drain to another catch basin. Solution? Cut out a section of asphalt full depth to the sandy soil, fill with 3 to 5 inch rock. This way the water infiltrates but vehicles can drive over the hole. This is working really well so we will be doing this on future container dock upgrade projects.