Sheet Flow Construction Erosion Control

April 28, 2020

Cool Things to do With Compost

Photo: David Jenkins

The bulk of the work will take place to the right of the silt fence. The grass will be removed and the area re-graded. The grass to the right of the construction fence will remain undisturbed. Some work will occur on the taxiway to the left of the tractor. Rather than use silt fence in this low risk area, compost berm will suffice. When done, the construction fence and stakes will be removed and re-used elsewhere and the compost will be spread out on the grass.

Powered by WordPress