Sheet Flow Construction Erosion Control

December 2, 2018

Hog Fuel Mulch

Construction Erosion Inspection Hog Fuel Mulch Prevents Fugitive Dust – You are hauling dirt on a dry day and the dust is flying.
The water truck driver’s head is about to explode trying to keep up with the dust control.
Save yourself a Labor and Industries claim!
Use ground up vegetation (hog fuel)! Don’t haul it to the landfill.

Download: Guide to Handling Fugitive Dust from Construction Projects.PDF

July 18, 2017

How Much Mulch?

How much mulch do you need to prevent erosion and maintain clean water?

Video: David Jenkins

September 30, 2010

Inspecting Straw Mulch

Video: David jenkins-Sheetflow

Soil cover is the most important factor to keep in mind when inspecting straw mulch. If you can see any bare soil, you need to place more straw.

December 18, 2020

Prepare for Fall and Winter Rains by Preventing Erosion

This is a blast from the past. I think I wrote this in 1996 with I was the first State-wide Erosion Control Coordinator at the Washington State Dept. of Transportation.

Preventing erosion is the best preparation.  Here are some things to consider when you prepare for fall and winter rains:

Cover bare soil. Final grades can be covered with hydroseed, erosion blankets, topsoil, bark or whatever final cover is planned for the project.

Get your hydroseed contractor lined up now and avoid the October rush.

Don’t open up more than a few acres after September 1st.

Grades that aren’t being actively worked can be covered with straw at a rate of 3000 pounds per acre. This is a very cheap and effective way to protect bare soil from raindrop impacts and erosion. Hand seed before spreading the straw. Spray it with water to help hold it in place.

Track your slopes with a Cat: up and down slope, not across slope. The first helps prevent erosion, the second speeds it up.

Use flex pipe drains at bridge ends if your permanent drainage system and curbs are not in place. Collect the water from the bridge using sand bags and divert it to the pipe. Make sure the pipe is long enough to reach the bottom of the slope.

Another good way to prepare for fall and winter rains is to use a water truck and water seeded areas weekly to get quicker growth. The better the growth going into winter the better.

If you have to open up a large area, only clear and grub small areas. You can clear larger areas if you don’t grub. Roots and slash help protect the bare soil.

Walk the site looking only at erosion controls, thinking ahead of areas that could have a problem. Identify them and start making additions and corrections.

Locate all existing water flows in and around your project and find out where they drain to.

Think about maintenance and regular inspection of erosion controls. When are silt fences going to be inspected and who does it? Who removes mud from check dams? Who covers slopes with straw or other mulch?

Get materials on site now. Again beat the rush for materials in October and November when everyone is in a panic to get plastic and straw. Stockpile enough straw, plastic, silt fence, flex pipe, sand bags, seed, rock, now to cover all areas that are bare.

Set up emergency procedures now. Who should be called in emergencies? Do you have a Certified Erosion and Sediment Control Lead (CESCL)? Brief your personnel on what to do if they see muddy water and who to go to.
Make sure that erosion control material installers know proper installation methods.

Make sure all your silt fence is installed on contour with the ends flared up slope a few feet. If it is not on contour, identify the lowest points of the fence as these will be the failure spots. Install a double row of silt fence at these low spots before you have a failure. Double up your silt fence in areas where eroding slopes could flow into wetlands or streams.

Do you have bare spots where previous seeding hasn’t grown? Cover it with seed and straw if the area is small, remobilize the hydroseeder for larger areas.

Make sure all catch basins within the project boundary are protected with inserts, fence surrounds, or other methods to keep mud out. Locate any catchbasins outside project boundaries that may receive water from your site and protect them.

Make sure that you have a copy of the  Temporary Erosion and Sediment Control plan (TESC) and any grading or environmental permits on site in the job shack. Know what they say. Give each inspector a copy of the TESC to keep in their truck. These are working copies that can be adapted to site conditions.

Modify your permanent stormwater ponds into temporary sediment ponds by installing a standpipe and blocking the outlet with sand bags. Cut a few small holes in the standpipe to allow for slow release of water. You can also use perforated pipe as the standpipe and hold it in place with “T” posts, wire, and gravel piled up around it.

Use geotextile fabric as a temporary ditch lining to protect bare soil from erosion. Hold the fabric in place with rock check dams, wooden stakes, or sand bags.

Make sure that all check dams are installed so that the top center point is lower than the bottom end points. This prevents end-cutting. You may have to add more material to the dam to increase the width, especially on wide ditches with shallow grade side slopes.

Now you know how to prepare for fall and winter rains: Prevent Erosion

April 13, 2020

Hydroseeding Around a Fence

Photo: David Jenkins
Photo: David Jenkins

Hydroseed after the fencing is installed. If you don’t, the seed and mulch get trampled by the fence guys and get covered by the dirt excavated from the post holes. Country Green Hydroseeding in Olympia, Washington.

November 26, 2015

Rainy Season Preparation

Dirty Water Flowing in Ditch

Preparing for the Rainy Season
David S. Jenkins
WSDOT Statewide Erosion Control Coordinator
September 1997

Now that the El Nino has ended and the La Nina has begun, the National Weather Service is predicting a much wetter fall and winter than normal. So, what are some things you can do now to prepare? How about: (more…)

November 26, 2012

What You Can Do to Control Erosion and Protect Your Property

Before and During Construction

Plan construction activities during spring and summer, so that erosion control measures can be in place when the rain comes.
Examine your site carefully before building. Be aware of the slope, drainage patterns and soil types. Proper site design will help you avoid expensive stabilization work.
Preserve existing vegetation as much as possible. Limit grading and plant removal to the areas under current construction. (Vegetation will naturally curb erosion, improve the appearance and the value of your property, and reduce the cost of landscaping later.)
Use fencing to protect plants from fill material and traffic. If you have to pave near trees, do so with permeable asphalt or porous paving blocks.
Preserve the natural contours of the land and disturb the earth as little as possible. Limit the time in which graded areas are exposed.
Minimize the length and steepness of slopes by benching, terracing, or constructing diversion structures. Landscape benched areas to stabilize the slope an improve its appearance.

As soon as possible after grading a site, plant vegetation on
all areas that are not to be paved or otherwise covered.
Control dust on graded areas by sprinkling with water,
restricting traffic to certain routes, and paving or graveling
access roads and driveways.

Temporary Measures to Stabilize the Soil

Grass provides the cheapest and most effective short-term erosion control. It grows quickly and covers the ground completely. To find the bet seed mixtures and plants for your area, check with your local nursery, the U.S. Department of Agriculture Soil Conservation Service, or the University of California Cooperative Extension.

Mulches hold soil moisture and provide ground protection from rain damage. They also provide a favorable environment for starting and growing plants. Easy-to-obtain mulches are grass clippings, leaves, sawdust, bark chips and straw. Straw mulch is nearly 100% effective when held in place by spraying with an organic glue or wood fiber (tackifiers), by punching it into the soil with a shovel or roller, or by tacking a netting over it. Commercial applications of wood fibers combined with various seeds and fertilizers (hydraulic mulching) are effective in stabilizing sloped areas. Hydraulic mulching with a tackifier should be done in two separate applications: the first composed of seed fertilizer and half the mulch, the second composed of the remaining mulch and tackifier. Commercial hydraulic mulch applicators – who also provider other erosion control services – are listed under “landscaping” in the phone book.

Mats of excelsior, jute netting and plastic sheets can be effective temporary covers, but they must be in contact with the soil and fastened securely to work effectively.

Roof drainage can be collected in barrels or storage containers or routed into lawns, planter boxes and gardens. Be sure to cover stored water so you don’t collect mosquitoes, too. Excessive runoff should be directed away from your house. Too much water can damage trees and make foundations unstable.

Structural Runoff Controls

Even with proper timing and planting, you may need to protect disturbed areas from rainfall until the plants have time to establish themselves. Or you may need permanent ways to transport water across your property so that it doesn’t cause erosion. To keep water from carrying soil from your site and dumping it into nearby lots, streets, streams and channels, you need ways to reduce its volume and speed. Some examples of what you might use are:

Riprap (rock lining) to protect channel banks from erosive water flow.
Sediment trap to stop runoff carrying sediment and trap the sediment.
Storm drain outlet protection to reduce the speed of water flowing from a pipe onto open ground or into a natural channel.
Diversion dike or perimeter dike to divert excess water to places where it can be disposed of properly.
Straw bale dike to stop and detain sediment from small unprotected areas (a short term measure)
Perimeter swale to divert runoff from a disturbed are or to contain runoff within a disturbed area
Grade stabilization structure to carry concentrated runoff down a slope

From Association of Bay Area Governments: www.abag.ca.gov/bayarea/enviro/erosion/eyoudo.html

September 4, 2012

Prepare for Fall and Winter Rains

Winter is approaching, now is the time to get construction projects ready. Here are some things to consider:

Cover bare soil. Final grades can be covered with hydroseed, erosion blankets, topsoil, bark or whatever final cover is planned for the project.

Get your hydroseed contractor lined up now and avoid the October rush.

Don’t open up more than a few acres after September 1st.

Grades that aren’t being actively worked can be covered with straw at a rate of 1500 pounds per acre. This is a very cheap and effective way to protect bare soil from raindrop impacts and erosion. Hand seed before spreading the straw. Spray it with water to help hold it in place.

Track your slopes with a Cat: up and down slope, not across slope. The first helps prevent erosion, the second speeds it up.

Use flex pipe drains at bridge ends if your permanent drainage system and curbs are not in place. Collect the water from the bridge using sand bags and divert it to the pipe. Make sure the pipe is long enough to reach the bottom of the slope.

Use a water truck and water seeded areas weekly to get quicker growth. The better the growth going into winter the better.

If you have to open up a large area, only clear and grub small areas. You can clear larger areas if you don’t grub. Roots and slash help protect the bare soil.

Walk the site looking only at erosion controls, thinking ahead of areas that could have a problem. Identify them and start making additions and corrections.

Locate all existing water flows in and around your project and find out where they drain to.

Think about maintenance and regular inspection of erosion controls. When are silt fences going to be inspected and who does it? Who removes mud from check dams? Who covers slopes with straw or other mulch?

Get materials on site now. Again beat the rush for materials in October and November when everyone is in a panic to get plastic and straw. Stockpile enough straw, plastic, silt fence, flex pipe, sand bags, seed, rock, now to cover all areas that are bare.

Set up emergency procedures now. Who should be called in emergencies? Do you have a WSDOT certified Erosion and Spill Control Lead? Brief your personnel on what to do if they see muddy water and who to go to.
Make sure that erosion control material installers know proper installation methods.

Make sure all your silt fence is installed on contour with the ends flared up slope a few feet. If it is not on contour, identify the lowest points of the fence as these will be the failure spots. Install a double row of silt fence at these low spots before you have a failure. Double up your silt fence in areas where eroding slopes could flow into wetlands or streams.

Do you have bare spots where previous seeding hasn’t grown? Cover it with seed and straw if the area is small, remobilize the hydroseeder for larger areas.

Make sure all catch basins within the project boundary are protected with inserts, fence surrounds, or other methods to keep mud out. Locate any catchbasins outside project boundaries that may receive water from your site and protect them.

Make sure that you have a copy of the Stormwater Site Plan (SSP) and Temporary Erosion and Sediment Control plan (TESC) and any grading or environmental permits on site in the job shack. Know what they say. Give each inspector a copy of the SSP and TESC to keep in their truck. These are working copies that can be adapted to site conditions.

Modify your permanent stormwater ponds into temporary sediment ponds by installing a standpipe and blocking the outlet with sand bags. Cut a few small holes in the standpipe to allow for slow release of water. You can also use perforated pipe as the standpipe and hold it in place with “T” posts, wire, and gravel piled up around it.

Use geotextile fabric as a temporary ditch lining to protect bare soil from erosion. Hold the fabric in place with rock check dams, wooden stakes, or sand bags.

Make sure that all check dams are installed so that the top center point is lower than the bottom end points. This prevents endcutting. You may have to add more material to the dam to increase the width, especially on wide ditches with shallow grade side slopes

December 31, 2010

Construction Erosion Control Inspection-Part 1

Inspecting construction erosion control on a small construction project staging area using the following best management practices: silt fence, plastic covering, stabilized construction entrance, straw wattle, straw mulch and asphalt berm.

 

Video: David Jenkins

July 27, 2010

Inspecting – 80% Grass Cover

Video: David Jenkins-Sheetflow

This is one way you can check the grass and mulch cover percentage using Line Intercept Sampling.